Penmann successfully delivered a significant HVAC upgrade at Nutricia’s Liverpool-based production site, supplying a purpose-built ventilation and climate control system built to comply with demanding hygiene and production standards. The scope included the design, supply, installation and commissioning of high-specification HVAC systems across civil, Medium Care (MC) and High Care https://hotbookmarkings.com/story20662417/penmann-delivers-comprehensive-hvac-refurbishment-for-nutricia-s-production-facility-in-liverpool-supporting-fsi-phase-1-2